TranSystems
 

Chevron Phillips Storage-In-Transit Yard Construction

Chevron Phillips

Project Summary

TranSystems provided engineering design services for this project, and was subsequently retained to provide construction management. Services included responding to the contractor's Requests for Information, reviewing submittals and payment requests, on-site inspections, weekly meetings, and preparing status reports. The three SIT yards are being constructed simultaneously, which requires close coordination between design team members and personnel from Chevron Phillips. TranSystems is working with plant personnel at each location to ensure that disruptions to existing operations are minimized and that the schedule is followed as closely as possible.

Project Highlights

  • Design and construction management services
  • Coordination of three SIT yards being constructed
  • Minimized disruptions to operations
 

Project Portfolio

Keyword*

*Seperate keywords by comma
Markets (may select more than one)



Regions (may select more than one)


Project Category (may select more than one)


Close