Breakwater and Fuel Pier Repair

NAVFAC Atlantic

Project Summary

When storms damaged the 2,000-foot-long breakwater, TranSystems documented the damage and then managed the team that performed a wind/wave study using satellite data. The resulting data was used for computer and physical modeling of the repair design concepts. The team designed both emergency and permanent solutions, with TranSystems taking responsibility for total project management, preparation of contract documents and construction management.

Project Highlights

  • Documented storm damage and performed wind/wave study
  • Designed emergency and permanent solutions
  • Computer and physical modeling used for repair concepts
 