Project Summary

When Barilla needed a new plant on the East Coast to meet manufacturing and distribution needs, a design-build approach was adopted with the goal of completing the design on an aggressive four-month schedule. TranSystems delivered the plans on time despite a challenging site that required extensive grading and drainage improvements, providing architecture and interior design along with site grading, storm drainage, cost estimating, material-handling for the warehouse, and mechanical, electrical and plumbing engineering. The 263,000 sq ft facility now produces 300 tons of pasta a year. TranSystems solution features a precast concrete structure with Cold Storage Insulated panels.

Project Highlights

  • Aggressive, 4-month schedule
  • Architecture, interior design and site grading planning
  • 263,000 sq. ft. facility produces 300 tons of pasta a year
 

Project Portfolio

Keyword*

*Seperate keywords by comma
Markets (may select more than one)



Regions (may select more than one)


Project Category (may select more than one)


Close