TranSystems
 

In The Spotlight

“In the Spotlight” showcases TranSystems’ news, staff, projects, awards, successes and other topics of special note to those in the industry as well as our clients.
A Smooth Ride: Airport Transit System Extension at O’Hare International Optimizes Use of Property for Growth
By Michael Lenett, PhD, PE
Senior Professional / Assistant Vice President
TranSystems

When the new Airport Transit System (ATS) debuts at O’Hare International next year, travelers will no doubt be thrilled with its ease and convenience. But otherwise they may take no special note.

Of course, that’s kind of the idea – to provide a smooth, seamless, uneventful ride between the terminals and the new, offsite multimodal transit center (a consolidated rental car and parking facility).

While hurrying to their flight or to their car, travelers will be essentially unaware that, from a design and engineering point of view, the short trip between the terminals and the transit center may be the most exciting 1,800 feet of new rail in the country.

Changing the Way Millions Will Travel
The new Transit Center represents one of the largest infrastructure modernization projects in the country – if not the largest.

The Transit Center – a 4.5 million square-foot facility – will relocate and consolidate all of the airport’s rental car offerings. It will provide 4,100 rental car parking spaces, as well as rental car maintenance areas, quick turnaround areas and a 74,000 square foot customer service lobby. It also will provide 2,200 public parking spaces.

The Transit Center will free up more than 400,000 square feet of terminal space and streamline many airline and airport functions. It will serve more than 30,000 travelers daily and greatly reduce traffic and congestion around the terminals.

Selected by the City of Chicago Aviation Department, TranSystems designed both the transit center and the above-grade ATS extension that will link it to the terminals.

Two Rail Lines, 28 Spans
The design of the new ATS extension guideways included soil-bearing drill shafts, hammerhead and straddle-bent piers and steel girder superstructures for the inbound and outbound directions. This included 28 spans ranging from 43.5 feet to 157.5 feet.

What Makes This ATS Extension So Unique?
While this is a rail system, it’s a people mover with unique guidelines and codes that establish minimum requirements for safety and performance. These standards – the Automated People Mover Standards established by ASCE – also cover the design, construction, operation and maintenance of the guideways themselves. 

Working within ASCE guidelines, the design team had to find unique solutions for nearly every span of the guideways. Challenges included:

Guideway geometry. The rails are aligned along spirals and tangents and involve reverse horizontal curvature. The guideways follow these alignments however the steel girders use a series of continuous horizontal curves to parallel the rail spirals, thus simplifying girder fabrication.

Elevation changes. While the entire extension is above grade, the key elevation change came where the extension tied into the existing ATS. The transition needed to be smooth, with no “bump in the road.”

Right-of-way limits. The extension crossed over Mannheim Road – a significant thoroughfare – as well as buried utilities, including a 90-inch water main. Both the Illinois Department of Transportation and the Joint Action Water Agency had established significant right-of-way limits. There also was the newly constructed and widened Mannheim Road that needed to be protected. As a result, the longest spans were over Mannheim Road: 157.5 feet for the inbound guideway and 156 feet for the outbound.

Vertical clearances. Mannheim Road and the transit center required specific vertical clearances for safety. The guideways needed to provide this clearance but the resulting spans had to ensure sufficient load capacity as well as deflection and vibration control.

Rail crossover. There is a rail crossover just south of the transit center where inbound and outbound trains can switch tracks. TranSystems designed the steel to support that crossover, taking into account the 49-foot separation between the two guideways and the resulting horizontal and lateral force effects. The crossover region needed to be designed so that all girders had the necessary stiffness to minimize horizontal deflection.

Architectural aesthetics. The ATS of course extends into the new transit center, so for this section the team had to coordinate closely with the architects. The goals were to be aesthetically pleasing while providing proper vertical clearance, load support and deflection control. For this section, integral caps and corbels were incorporated into the pier designs to provide the required vertical clearance.

An Ideal Situation for Rail
The Multimodal Transit Center at O’Hare is under a half mile from the terminals, just minutes away. And a half mile is the ideal distance for using rail between airport terminals and transit centers.

With rail, you’re able to:
  • Transport people above-grade, essentially creating new space
  • Eliminate roadway congestion, including shuttle buses
  • Reduce dependence on roads and potentially free up land for terminal expansion
  • Expand or adapt as needed, creating no permanent obstacles

The O’Hare ATS extension shows that unique, long, multiple-span bridge systems using ASCE guidelines can work effectively. Designers and engineers can create cost-effective solutions that make minimal use of real estate while navigating through numerous obstacles and requirements.

In the end, rail allowed O’Hare International to optimize the use of their existing property while still allowing for future reconfiguration and growth.

About the Author
Mike Lenett is an assistant vice president with 26 years of experience in transportation engineering, primarily in structural design, task and project management. He serves as the bridge team leader, the structures technical lead and project manager on numerous state, county and municipal transportation projects.
Contact Mike at 800-800-5261 or mslenett@transystems.com.

Share/Bookmark
Click here to learn more information about TranSystems

More In The Spotlight

The Oklahoma Department of Transportation (ODOT) and BNSF Railway (BNSF) partnered to replace a BNSF bridge over the busy Interstate 235. The project was bid by ODOT as part of its largest construction package in history, at a contract bid price of $81 million, of which the truss bridge comprised $17.5 million. The contract time for the interchange project was 850 calendar days, which was reduced to 700 days using A+B bidding. Careful planning and modifying of construction sequences by the contractor further reduced the schedule to 550 days.
 
 click to read
TranSystems Corp., a national transportation consulting firm that provides engineering, architectural and planning solutions, welcomes Thomas Ionta, PE, as Vice President and Senior Project Manager in the company’s Santa Ana, Calif., office.   click to read
TranSystems has worked on more than 150 roundabouts in 13 states. Our traffic engineers nationwide work to help owners determine the best intersection to manage traffic and maintain safety for users.  click to read
With growing pressure to minimize costs and schedule on transportation projects, it’s increasingly important to ensure the best solutions and results. Applying practical design solutions can help owners find cost and time-saving measures to maximize tight budgets and schedules – ultimately delivering the best project to users.

 click to read
What makes a work zone smart? By providing Intelligent Transportation Systems (ITS) elements that have been traditionally deployed along highways into key work zones, you can ease congestion and increase safety of construction projects. Effective application of a Smart Work Zone will accomplish those objectives as well as achieve user satisfaction and cost effectiveness.

 click to read
Port Metro Vancouver in the Canadian province of British Columbia is the busiest port in Canada. With more than three major marine intermodal rail terminals, port authorities are continually looking for new ways to improve trucker access and operations in the busy region. TranSystems worked with the Port Metro Vancouver planning staff to develop a model that uses big data to identify areas for improvement and outline strategies for more efficient transfer of intermodal containers and reduced congestion at the terminals. click to read
TranSystems Corp., a national transportation consulting firm that provides engineering, architectural and planning solutions, welcomes Doug Wesselschmidt, PE, as Senior Project Engineer in the company’s Kansas City office.  click to read
TranSystems Corp., a national transportation consulting firm that provides engineering, architectural and planning solutions, welcomes Gail Woods, PE, as Assistant Vice President and Client Manager in the company’s Orlando office.   click to read